Nowadays it is necessary to optimize the Energy Efficiency and sustainability of future assets for both environmental and financial issues. Through its 30 years of expertise, TERAO has developed internally a methodology to optimize the building’s energy efficiency by being involved at the early stage of the design. By starting at the Schematic Design stage, TERAO has the capability to
At the worldwide scale, both buildings and buildings construction sectors combined are responsible for 36% of global final energy consumption and nearly 40% of total direct and indirect CO2 emissions. At the moment China is the biggest energy consumer in the world and building energy use is the second largest right after the US with 16% of total final energy
TERAO亚洲团队很高兴地宣布我们搬到了位于同乐坊的新办公室,与建筑工作室共享。它位于7号线昌平路站旁边,提供了一个大型的开放空间,有大量的采光。团队还增加了一些植物,使工作场所更加舒适,并将人们与大自然联系起来。我们的办公室
TERAO Asia team is happy to announce our move to a new office, shared with Architecture Studio, in Tonglefang complex. It is located next to line 7 Changping Road station and provides a large open space with a great amount of daylight. The team has also added some plants which make the workplace more comfortable and connect people with Nature.
最近的评论