SUEZ Renwu Waste-To-Energy Plant

工作范围:

Research solutions to lower on-site energy consumption

  • Waste cycle (induced draft fans, air fans…)
  • Steam cycle (boiler water pumps, condensers…)
  • Cooling water system (cooling towers…)
  • Support equipment (air compressors, chiller…)

结果:

Solutions include:

  • Upgrade of fan blades
  • Installation of Variable Frequency Drives
  • Monitoring recommendations
  • Replacement of aging pumps
  • Installation of an absorption chiller to use waste heat

相关案例