Pudong Warehouse

Scope of Work :

    • Feasibility study
    • LEED Consultancy

Results :

LEED Gold Certification

  • Optimize Energy Performance by solar panels plant on the roof
  • Infrared sensor tube routing
  • Installation (water-saving faucet and triangle valve, ventilation ducts, ventilation unit, vent)
  • Optimization of the existing system with occupancy and daylight sensor

Related Portfolio Items