EVERSPRING RESORT
Scope of Work :
- Solar PV Feasibility Study
- Energy battery storage study
Results :
- What kind of installation can be done in this project
- The economics of an on-site Solar PV installation and Battery storage
- The difference of the EPC (Engineering Procurement Construction) and PPA (Power Purchase Agreement) schemes
- The electricity savings the Solar PV would generate and related ROI
- The sizing of the battery storage system concerning the energy production of the Solar PV
- The local policies regarding Solar PV installation