SAFRAN FACTORY IN MALAYSIA
Scope of Work :
- Thermal comfort study
- Energy audit level 1
Results :
- Thermal comfort study through CFD modeling of the furnace building and final processing center including improvement plan through CFD analysis
- Energy audit level 1 with HVAC specific optimization study including energy analysis, energy efficiency improvement plan with a specific focus on HVAC and report.












































































![[CASE STUDY] Achieving 97% Energy Self-Sufficiency for a High-End Fit-out Manufacturer](https://teraoasia.com/wp-content/uploads/2026/07/cover-photo-150x150.jpg)
