LEGO Mega Factory
Scope of Work :
- Enhanced Commissioning
- LCA
Results :
2 LEED Platinum Certifications and 2 LEED Gold Certifications were achieved in March 2025.
- Equipment of ventilation, air conditioning systems and refrigeration (HVAC&R) systems (mechanical and passive) and associated controls
- Central plant (chiller, compressor, pump)
- Strong current
- BMS (Building Management System)
- Renewable energy systems
- Building envelope commissioning.





















































![[CASE STUDY] Achieving 97% Energy Self-Sufficiency for a High-End Fit-out Manufacturer](https://teraoasia.com/wp-content/uploads/2026/07/cover-photo-150x150.jpg)
