ERLAB FACTORY
Scope of Work :
LEED HVAC assistance – LEED Consultancy:
- LEED ID+C certification
- Energy model
- Feasibility study
- Design Brief
- Design Reviews
- HVAC optimization
- Passive design
Results :
- 31% of savings on manufacturing building (Air Handling Unit optimization) and reduction of MEP CAPEX impact (24%)
- Increase in thermal comfort
- High acoustic comfort in offices
- Optimization of offices façades to reach thermal comfort by reducing solar gains by 75%
- LEED ID+C Gold certification (68 points targeted)
- High energy efficiency in offices (64% savings compared to ASHRAE 90.1-2010 building reference)














































































![[CASE STUDY] Achieving 97% Energy Self-Sufficiency for a High-End Fit-out Manufacturer](https://teraoasia.com/wp-content/uploads/2026/07/cover-photo-150x150.jpg)
