PLASTIC INJECTION FACTORY
Scope of Work :
To relocate existing factory from Shanghai to Zhejiang by 2019. Production + office building NC scheme, warehouse under new scheme
- LEED Consultancy
- Pre-design (gap analysis), design, construction, certification
- Sustainability Assistance
Results :
Ongoing mission – currently in design stage
Chosen sustainability strategies include:
- Optimized Process cooling
- Optimized Dehumidification
- Solar power installation











































































![[CASE STUDY] Achieving 97% Energy Self-Sufficiency for a High-End Fit-out Manufacturer](https://teraoasia.com/wp-content/uploads/2026/07/cover-photo-150x150.jpg)
