SURFACTOR FACILITY
Scope of Work :
- Energy audit level 2
Results :
- Conduct an assessment to understand and map the on-site energy consumption.
- Assess the factory envelope and systems such as HVAC, lighting, compressed air, and process.
- Study strategies in terms of performance improvement on energy consumption reduction
- Analyze CAPEX and ROI estimations of the strategies.











































































![[Case Study]Boosting Productivity and Safety Through Optimized Factory Comfort](https://teraoasia.com/wp-content/uploads/2025/09/Cover-photo-150x150.png)