IKEA CUSTOMER DISTRIBUTION CENTER BEIJING

Scope of Work :

  • BREEAM Fully Fitted Certification
  • BREEAM Feasibility and Gap Analysis
  • Energy modeling using DesignBuilder
  • Passive design analysis
  • Carbon Study (LCA)
  • Life Cycle Cost study
  • Environmental construction follow-up

Results :

  • BREEAM Fully Fitted Very Good Level achieved in 2024.
  • The building saves up to 40% energy
  • Reducing by 60% the water usage
  • The EV car parking available encourages the use of lower carbon transport than classical fuel cars.

Related Portfolio Items