IKEA CUSTOMER DISTRIBUTION CENTER BEIJING
Scope of Work :
- BREEAM Fully Fitted Certification
- BREEAM Feasibility and Gap Analysis
- Energy modeling using DesignBuilder
- Passive design analysis
- Carbon Study (LCA)
- Life Cycle Cost study
- Environmental construction follow-up
Results :
- BREEAM Fully Fitted Very Good Level achieved in 2024.
- The building saves up to 40% energy
- Reducing by 60% the water usage
- The EV car parking available encourages the use of lower carbon transport than classical fuel cars.