ARAYMOND FACTORY
Scope of Work :
- LEED BD+C feasibility
- Low Carbon feasibility
- LEED BD+C assistance
- LEED Zero energy and carbon assistance
Results :
- LEED Gold
- LEED Zero energy and carbon
- Low Carbon
- Sustainability roadmap for the project
- Thermal comfort enhancement through thermal modeling
- Energy consumption reduction through envelope and HVAC system design improvement
- Embodied and Operational Carbon reduction














































































![[CASE STUDY] Achieving 97% Energy Self-Sufficiency for a High-End Fit-out Manufacturer](https://teraoasia.com/wp-content/uploads/2026/07/cover-photo-150x150.jpg)
