Dianapetfood Factory

Scope of Work :

  • LEED Consultancy
  • Pre-design, analysis, design, construction, certification
  • Sustainability Assistance

Results :

  • Management of the whole certification from concept design to commissioning stage
  • Process improvement to reach 20% savings compared to a classic factory
  • MEP commissioning activities on HVAC systems, lighting systems, BMS
  • Life-cycle analysis showing the structure was generating less carbon than classic local factory

Related Portfolio Items