Lux-mate Pudong Warehouse

Scope of Work :

  • Feasibility Study
  • LEED Consultancy

Results :

  • LEED Gold Certification
  • Optimize Energy Performance by solar panels plant on the roof
  • Infrared sensor tube routing
  • Installation (water saving faucet and triangle valve, ventilation ducts, ventilation unit, vent)
  • Optimization of existing system with occupancy and daylight sensor

Related Portfolio Items